- 2’nd Stage, Low Pressure Hose
- Atomic T3 Second Stage w/Hose:
- Balanced Linear Flow Design
- Pneumatically-Balanced Poppet Second-Stage
- Built-to-Last: Titanium Demand Valve Body, Lever and Sealing Orifice
- 2’nd Stage, Low Pressure Hose
- Atomic T3 Second Stage w/Hose:
- Balanced Linear Flow Design
- Pneumatically-Balanced Poppet Second-Stage
- Built-to-Last: Titanium Demand Valve Body, Lever and Sealing Orifice
Reviews
There are no reviews yet.